$35.00
$21.00
SKU:
lennox-ebony-sample-door
Quantity:
Out of Stock through Early January
Typically ships within 3-5 Weeks

Lennox Ebony Sample Door Overview chevron-down

See the quality, feel the wood, and see the true finish before purchasing your new cabinets! Samples ship out same day before 12pm EST, Mon-Fri. After 12pm samples will ship out the next business day. All samples are refundable!

Shipping & Returns chevron-down

Product Specifications

Sample Door Shipping Time: Samples ship out same day before 12pm EST, Mon-Fri. After 12pm samples will ship out the next business day
Shop this style RTA: Click here to shop RTA Cabinets from this style
Cabinetry Shipping Time:

Ships in 2-5 weeks

Style: Slim Shaker
Face Frame: 3/4" solid hardwood
Door Frame: Solid hardwood slim shaker frame
Door Center: Plywood center with HDF on either side
Sides: 1/2" plywood
Top & Bottom (Wall): 1/2" plywood
Bottom (Base): 1/2" plywood
Back Panel: 3/16" plywood skin on a 1/2" plywood frame
Shelves: 1/2" or 3/4" plywood shelves with matching veneer and edge banded finish (1/2" for 30"W cabinets and under, 3/4" for 30"W and over), plastic shelf clips
Base Cabinet Shelf Depth: 16"
Drawer Box: 3/4" solid hardwood, 5-piece drawer front, 5/8" solid wood, dovetailed drawer box with 1/2" plywood drawer bottom, polyurethane clear coated (will not need to be finished)
Drawer Glides: Heavy duty, soft-close, undermount drawer glides with 77 lbs weight capacity
Base Corner Supports: 90 degree heavy duty metal corner brackets
Overlay: Full
Hinges: Concealed, 6-way adjustable hinges with 105 degree opening angle and 65 lb weight capacity
Cabinet Interior: Matching
Center Stile:

None

Assembly Method: Nail/Screw/Staple/Glue
Finish:

Acid-catalyzed paint, extremely durable and resistant

Toe Kick: 1/2" plywood toe kick
Installation Rail: 3"W, 1/2" installation rail on all cabinets, along all 4 sides. Wider cainets will also have another vertical rail in the middle.
Wall Cabinet Bottoms Finished (Exterior): Yes (side panel bottom edges will be unfinished)
CARB Compliant: Yes
Door Hinges: Hinges will needed to be installed, pre-drilled on both sides
Toe Kicks Included w/Base Cabinets: Yes *please note that 8' pieces of toe kick need to be purchased for cabinets side by side, to hide gaps*
Sides Panels Finished: Matching
Installation/Designer Note:

If installed directly against a wall or deeper cabinet/appliance, 1/4" space is recommended, scribe molding can be installed between the cabinet and the wall (or deeper cabinet), if needed. If not, the door may not be able to open a full 90 degrees. A larger space may be needed depending on the decorative hardware used on the cabinets.

The cabinet depth measurement listed is the depth from the front of the face frame to the back of the cabinet, and does not include the cabinet door depth.

Schematic images and renderings are generic and may not represent exact construction details for each collection. The exact specifications for this collection can be found in the construction details listed above.